Technical data

Mountain Series CE
Installation and Operation Manual
8
An ongoing program of product improvement may require us to change
specifications without notice. WS-MS-(RFG, RFG-IR)-CE,
Revised May 2014 Doc no: M0037.01
info@woodstone-corp.com or visit woodstone-corp.com
wood stone corporation
1801 w. bakerview rd.
bellingham, wa 98226 usa
t. +1.360.650.1111
f. +1.360.650.1166
UNLOADING AND MOVING
ASSEMBLY
1.
Mount the oven mantle (if provided) directly below the doorway and flush with the floor using the hardware provided�
2. Mount the stainless steel toe kick to the front of the oven stand, near the floor using the hardware provided�
3. Mount the service/intake panel to the brackets on the front of the stand, directly below the doorway, using the hardware
provided�
a. Do not obstruct the flow of combustion and ventilation air between the toe kick and the bottom of the service/
intake panel�
b. This panel is the only access for servicing the gas and electrical components of the oven so it must be left
accessible and removable�
ASSEMBLY INSTRUCTIONS