Specifications

An ongoing program of product improvement may require us to change
specifications without notice. WS-MS-(4, 5, 6, 7)-W-IR,
Revised May 2015. Doc no: M0036.04
28
Mountain Series
Installation and Operation Manual
info@woodstone-corp.com or visit woodstone-corp.com
wood stone corporation
1801 w. bakerview rd.
bellingham, wa 98226 usa
tf. 800.988.8103
t. 360.650.1111
f. 360.650.1166
FRONT PANEL ASSEMBLY
STANDARD FRONT PANEL AND TOE KICK ASSEMBLY INSTRUCTIONS
D
D
B
D
D
B
D
D
D
D
C
C
A
A
A
Controller
Transformer Box
Contains terminal strip for incoming power supply
NOTE:
Have licensed electrician make this electrical connection�
Service Panel
A Hex-head self-tapping screw Used to attach Toe Kick� 5 total�
C Phillips head #10 screw Used to attach Service Panel to Throttle Knob Bracket� 2 total�
D Phillips head self-tapping screw Used to secure the sides of the Service Panel� 8 total�