VHood IG

6 | Wolf Customer Care 800.222.7820
Installation
1 Place the mounting tabs over the mounting screws. Use
the leveling adjustment screws to ensure the hood is
level. Refer to the illustration below.
2 Place the backdraft damper on the round discharge
then install 6"
(152) round metal ducting (not provided)
to the damper and seal with aluminum tape.
3 Mount the electrical box to the wall using the screws
provided.
4 Insert the power supply from the home and the cord
provided into the electrical box.
5 Make electrical connections and install the cover.
6 Insert the plug into the receptacle on the top of the
hood.
7 Secure the upper chimney flue to the mounting brack-
ets using the screws provided. Refer to the illustration
below. Place the lower chimney flue over the upper,
then lower until it rests on the hood.
Installation
WALL HOOD
IMPORTANT NOTE: The hood is wired for an internal
blower. If an in-line or remote blower will be used, refer to
In-Line/Remote Blower Wiring on page 9.
If an internal blower will be used, install the blower prior
to mounting the hood. Refer to page 8 for internal blower
installation.
1 Mark the centerline for the location of the two mount-
ing holes using dimensions shown in the chart and
illustration below. Additional wall framing is recom-
mended in this location. If wall framing is not available,
the use of wall anchors is recommended. Install the
mounting screws so there is approximately ⁄"
(6) gap
between the screw head and the wall. Position the two
mounting brackets for the chimney flue, then install
using two mounting screws per bracket. Refer to the
illustration below.
MOUNTING LOCATION A
Black Hood 12⁄" (324)
Stainless Hood 16⁄" (416)
Glass Hood 12⁄" (319)
MOUNTING
TAB
LEVELING
SCREW
Mount and level hood
Install telescopic flue
BOTTOM OF HOOD
CEILING
A
9
1
/8
"
(232)
17
1
/16
"
(433)
3
/4
"
(19)
Mounting location
2
3
4
5
8
6
7