WMF coffeemachines WMF espresso planning information http://www.wmf-kaffeemaschinen.
WMF coffeemachines µ WMF espresso planning information Conditions for usage and installation Any necessary on-site preparatory work for electricity, water and drainage connections at the customer‘s premises is to be arranged by the machine owner / operator. The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations. The WMF service engineers may only connect the coffee machine to existing prepared connection points.
WMF coffeemachines µ WMF espresso planning information Ventilation If ventilation possibility is limited sufficient ventilation need to be provided e.g machine on feet extension, active ventilation, additional ventilation slots/ openings in counter area. Ventilation slots must not be covered. Under certain circumstances a forced ventilation on site is necessary to ensure heat dissipation.