Installation Manual
3
4c. Top of Flange adjusted flush with Floor Covering. 4b.Confirm top edge of Flange is level with Floor Covering
w
ith Level or Straight Edge.
4e. Seal edge of Flange with Grout or Silicone.
5. Re-attach Lid in Trim Ring and re-insert āLā Pins and
Hinge Clip Cap.
6. FINISHING (Carpet Installation ā FPC Series): Cut
Carpet Insert (see Template on last page) and mount
to Lid with Carpet Tape or Glue.
Hold-Down
Screw
B
eveled
W
asher
N
ylon
S
houlder
W
asher
A
djusting
S
crew
Trim Ring
Tile
Carpet
Insert
4d.RFB6 Installation Only ā Top of Flange adjusted
flush with Floor Covering.
ATTACHMENT
S
CREW
NON-FLANGED
STYLE FLOOR PORT
TRIM RING
ADJUSTING
SCREW
BEVELED
WASHER
NYLON
SHOULDER
WASHER
7. Installation complete.