Installation Manual

3
CAUTION: Cover must be removed to rotate Poke Thru once it has been installed in the floor.
Step 6 Orient Poke Thru so that the three channels span across the corrugations of the deck.
Push Poke-Thru into floor.
Device openings must
span across deck
Step 7 Installation complete.
B BA A