Operating instructions

WirelessHART Fieldgate SWG70 7 Commissioning
Endress+Hauser 37
7.5.3 Parameterize Fieldgate SWG70
1 Right-click on the HART IP Communication node and select Connect
The HART IP CommDTM is put on-line and the two arrows turn green
2 Right-click on the Fieldgate SWG70 node and select Connect:
The Fieldgate SWG70 DTM is put on-line and the two arrows turn green
3 Right-click on the Fieldgate SWG70 node and select Online Parameterize:
The DTM of Fieldgate SWG70 opens
4 Expand the navigation tree to reveal the parameter blocks (here shown with the
Identification page open):
You are now ready to configure the device, see Chapter 8