Installation Manual
59
CONFIDENTIAL UNDER NON-DISCLOSURE AGREEMENT (NDA)
Rev A1
Document:
WSS 4G Aircraft Installation Manual 750-
00003-00 Reva1.Docx
July -30
2020
6.2.4
System Traffic and Power tests
The following sections provide an overview of the steps required to perform a system
traffic test and system power test utilizing the WSS SmartCart ground test
equipment.
For full details regarding setup, configuration and test requirements, please refer to the
SmartCart Operations Manual, PN 600-00336-000.
Step
Process
1
Setup
SmartCart
Setup test equipment for the Traffic Test in accordance to
SmartCart Operations Manual, PN 750-000XX-00.
2
Perform
Traffic Test
Execute Traffic Test to verify end-to-end data connectivity from the
aircraft cabin to WSS core network.
3
Download
test report
Using the SmartCart user interface, download and email the
successful test report to support@wireless2.com . See SmartCart
Operational Manual for more information.
4
Setup
SmartCart
Setup test equipment for the Max Power Test in accordance to
SmartCart Operations Manual, PN 750-000XX-00.
5
Perform Max
Power Test
Execute Max Power Test to verify the WSS 4G System is transmitting
at maximum power from the port side beam of the FDQ antenna
6
Repeat Max
Power Test
Repeat Max Power Test x3 to verify max power from aft, starboard and
forward beams of the FDQ antenna. See SmartCart Operational Manual
for more information.
6.3
Flight Test
The Ground Test Process has been designed to validate the system installation,
provisioning & activation and network connectivity. Should the Installer require system
specific flight validation of the system’s operation after conducting ground testing, the
following provides guidance for in-flight user validation of the system.
NOTE: This testing can only be performed within WSS network coverage. Please consult
with Wireless Systems Solutions regarding coverage and availability, and suitable flight
planning. The following provides an overview of the validation steps.