Installation Manual

48
CONFIDENTIAL UNDER NON-DISCLOSURE AGREEMENT (NDA)
Rev A1
Document:
WSS 4G Aircraft Installation Manual 750-
00003-00 Reva1.Docx
July -30
2020
Note 11: After stripping cable outer jacket, secure ends of braided shield and foil shield using insulation
sleeving indicated.
Note 12: Fit a length of braid wire, IN (ITEM NUMBER) 17, such that it covers the cable outer jacket, the
exposed cable shield, and the connector chimney or back-shell.
Secure one end of IN 17 on the cable shield using IN 8 and secure the other end of IN 17 to the
connector chimney or back-shell, again using IN 8. Completely cover IN 17 using boot seal, IN 18, or
sleeving, IN 27, 28 as indicated.
Note 13: Splice 2 conductors, IN 11, 3.00-in long, using IN 19. Install sleeving, IN 27, over splice, not
shown.
NOTE: Wire listed is for reference only. Wires used for the installation are to be
determined by the installer as applicable to the aircraft.
5.2.2
ABR Antenna Power Output (P1-B)
The P1-B connection is used for 28VDC for both the FDQ and the HPB.
Table 5.2.2-1 P1-B Parts List
Quantity
Manufacturer & Description
Part Number
Drawing Item
Number (IN)
1
TE Connectivity/Deutsch DMC
Chimney
732-8052-18A
7
2
GlenAir
Tie-down Strap
600-057 or equivalent
8
1
Braid Wire (36AWG, .500DIA)
AA59569R36T0500 or
equivalent
17
A/R
Insulation Sleeving (.375DIA)
M23053/4-104-0 or equivalent
27
A/R
Insulation Sleeving (.500-.195DIA)
M23053/4-105-0 or equivalent
28
A/R
Insulation Sleeving (.063- .031)
M23053/5-102-0 or equivalent
36
1
Boot Seal
HSB-2-1 or equivalent
18
A/R
Cable, 22AWG/4 COND
M27500-22TG4T14 or
equivalent
15