
58 RT 1000 v1.3 Deployment Guide R03.d
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Backhaul
Setting up the Backhaul Equipment
7 Insert the mast into the base collar, extend and secure each section of the
mast at the mark on each section.
Figure 4–30 Securing the Base