User's Manual
Draft
R03.d RT 1000 v1.3 Deployment Guide 21
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Layout
Laying Out the Equipment
2.5.1 Prerequisites
You can attach the batteries, antennas, and geophones to the ground equipment
prior to going into to the field, or as you place each unit. If you are assembling as
you place the units, ensure that you have sufficient quantities for each unit, plus a
few spares.
The RT 1000 shall be used with only the supplied antennas (Table A–1 Antenna
Specifications, on page 85) attached to the WRU with an integrated type N male
connector.
The RT 1000 antennas shall be installed and handled by professionals
specifically designated for this purpose.
Changes or modifications not expressly approved by Wireless Seismic, Inc. can
void the users’s authority to operate the equipment.
2.5.2 Assembling the Ground Equipment
This section describes the process to assemble the ground equipment prior to
deployment.
To assemble the ground equipment:
1 Gather the equipment:
● WRU or BSU
● Antenna
● Geophone
● Batteries
2 Gather any special tools:
● Nylon grip pliers
● Loctite® 222
3 Attach one or more batteries to the WRU or BSU.
● Press the battery into the connector.
● Flip the bail over the molded area on the end of the battery.
● Press the lever until the catch snaps to lock it in place.
WARNING
In order to comply with FCC radio frequency (RF) exposure
requirements, the RT 1000 units must be installed so that a minimum
separation distance of 20 cm is maintained between the antenna(s) and
all persons at all times during normal operation.