User's Manual
Draft
R03.d RT 1000 v1.3 Deployment Guide 13
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Layout
Preparing the Equipment
● Any other shot-related equipment
● Two-way radios
2.3 Preparing the Equipment
Ensure that the central recording system has the latest software available installed
(see in the RT 1000 Release Notes).
Ensure that the ground equipment has the latest firmware available installed (see
in the RT 1000 Release Notes).
Ensure that the industry standard best practices are followed for securing the
equipment for transport.
2.4 Setting Up the Central Recording System
You can prepare the central recording system hardware and software while the
ground equipment is being placed in the field.
Set up the computer and peripheral equipment in the central recording system
truck or trailer.
2.4.1 Setting up the Computer
TBD
2.4.2 Connecting to the Source Controller
This section describes how to connect a source controller or Source Interface Unit
(SIU) to the CSS computer.
TBD
The following figures and tables show the signals on each pin for the three possible
cables used to connect an SIU to the CSS computer:
Table 2–1 BSU DATA-POWER Cable Pin List
Signal
Name
Wire Color
27-Pin
Connector
RJ45
Connector
16-Pin
Connector
2-Pin
Connector
Twisted
Pair
TX+ WHT/ORG *
(WHT/GRN)
R1——
Twisted Pair
TX- ORG *
(GRN)
P 2 — —