User's Manual
Manuals
Brands
Wireless Seismic Manuals
Electronics
Base Station Unit
1
2
3
4
5
6
7
8
9
10
Table Of Contents
Table of Contents
List of Figures
List of Tables
Overview
1.1 About this Guide
1.2 Who Should Use this Guide
1.3 Other Documents
1.4 Getting Help
Layout
2.1 Overview
2.2 Mobilization
2.2.1 Prerequisites
2.2.2 Getting Ready
2.3 At the Site
2.3.1 Set Up the Dog House
2.3.2 Laying Out the Equipment
2.3.2.1 Prerequisites
2.3.2.2 Placing the Equipment in the Field
2.3.2.2.1 WRU
2.3.2.2.2 BSU
2.3.2.2.3 LTU
2.3.2.2.4 Geophone
Software
3.1 Overview
3.2 Installing the Software
3.3 Upgrading the Software
3.4 Upgrading the Firmware
Testing and Maintaining the Equipment
4.1 Overview
4.2 Testing the Layout
4.2.1 Line Tests
4.2.2 Source Control Tests
4.2.3 Acquisition Parameter Testing
4.2.4 Built-In-Self-Test (BIST)
4.3 Maintaining the Equipment
4.3.1 Units
4.3.2 Antennas
4.3.3 Geophones
4.3.4 Cautions
Rolling the Line
5.1 Overview
5.2 Process
Demobilization
6.1 Overview
6.2 Process
Troubleshooting
7.1 Overview
7.2 Specifications
7.2.1 Ground Units:
7.2.2 Central Server:
7.2.3 Battery Charger:
7.2.4 Batteries:
7.3 LED Chart
Legal Information
8.1 FCC Rules and Regulations Compliance
Glossary
Index
Draft
R00.f
RT 1000 v1.0 Deployment Guide
5
© 2010-2011 Wireless Seismic,
Inc. All rights reserved.
List of Figures
List of Figures
Figure 2–1
WRU
.......
..........
...........
..........
...........
............
...........
..........
...........
.
16
1
...
2
3
4
5
6
7
...
...
34