User's Manual

Draft
RT 1000 v1.0 24 Deployment Guide R00.f
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
6
Demobilization
6.1 Overview
xxx
6.2 Process
xxx
As soon as the Event Manager tool has determined that a WRU is no longer
needed at that location, it will change color on the basemap. The Observer will
need to consider the possibility of reshooting source points, which could
happen if some recording failure is discovered later. Assuming no such
reshoots, the Observer can undeploy the WRU or the entire rib. There will be
no detrimental effect to either the ground electronics or the CSS database if
the pick-up crew starts picking up the line before the Observer has undeployed
it (e.g. if the backhaul is interrupted), as long as the Observer manually
removes the picked-up WRUs from the deployed list at a later date. However,
the preferred procedure for accurate asset tracking is to deploy from the CSS
before physical pick-up.
Another option is for an LTU technician to undeploy a rib using the HRA while
connected into the LTU/BSU. This can only be done when the rib has finished
all recording operations. This requires that a message indicating which WRUs
have been undeployed be sent to the CSS after this action.
Undeployment user action in the CSS can be either from the basemap or from
a spreadsheet listing within the CSS application. An “are you sure” pop-up
should be considered, especially for large numbers of WRUs and certainly for
WRUs that haven’t been cleared by the Event Manager.
Once a WRU or rib is undeployed by the Observer through the CSS, it is up to
the staging manager to ensure the physical pickup and asset tracking of the
ground electronics. At the end of the project, the primary need the Observer
has of the CSS is to ensure that all positional and trace data has been stored,
backed up, and delivered properly. He will then need to power everything
down and secure all hardware for transport.