User's Manual

Draft
22 RT 1000 v1.0 Deployment Guide R00.f
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Testing and Maintaining the Equipment
Maintaining the Equipment
tests should be run only after it is established that there are no problems with the
analog channel.
• Spread Noise
• Geophone analysis
• Pulse
• DC Ohms
• DC Leakage
4.3 Maintaining the Equipment
xxx
4.3.1 Units
4.3.2 Antennas
4.3.3 Geophones
4.3.4 Cautions