Testing and Maintaining the Equipment
Testing the Layout
You can record the parameter tests with one live receiver line while the layout
crews are continuing to work on the next nine lines. This way, the parameter
testing won’t consume any potential production time.
You can economize by combining some of the tests.
4.2.4 Built-In-Self-Test (BIST)
• A method will be provided for synchronizing tests across all WLSs
• Tests executed during deployment are for “go/no-go” purposes. The WRU will
perform low-resolution evaluations of deployment tests and indicate the result with
the battery LEDs. This is to save time and power and to reduce the effort required
to write high-resolution evaluation in the WRU
There will be tests to implement in 2 places. We plan a “go no-go” test at the WRU
that will be a simple calculation (not high precision) in order to assess if the
channels and geophones are good. This could be done by Alex or someone like
him. At the BSU application or LTU, the data for each of the test records (some
tests have several records) would be sent from the WRU and processed with
precision and the values for the tests calculated. I have someone that can write
this software. The main reason to do this is when the system is audited the data
and results for the same data, must be provided for analysis. If we do precision
calculations at the WRU it adds complexity and may increase processing
requirements
• Tests executed from the central system are for verifying the WRU specifications.
• WRUs will be commanded to execute internal and/or external tests. The data will
be returned to the base station (in early development) or to the central system for
high-resolution evaluation
Internal
During these tests the Geophone is disconnect electrically for the preamp. An
internal test oscillator (where appropriate) drives the WRU analog channel in order
to measure the characteristics of the Preamplifier and A/D. These tests should be
run prior to running the external tests.
• Equivalent Input Noise (EIN)
• Total Harmonic Distortion THD
• Pulse
Calibration
• Channel Gain error and Phase error
B. External
During these tests the geophone is connected to the preamplifier and test circuitry
for the purpose of measuring and characterizing the planted geophone. These