User's Manual
Table Of Contents
Draft
R00.f RT 1000 v1.0 Deployment Guide 15
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Layout
At the Site
► Charging batteries
– Charging Rack/# of batteries (10?)
– Charging Times
● Updating software in the central and ground units (maybe refer them to the
sw chapter).
List of non-WS equipment:
● Dog House
► power source (diesel, benzene or other type of fueled generator)
► heating, cooling and ventilation system
► antenna masts for voice radio, data telemetry, source control, and
possibly satellite phone and/or internet
► shock-mounted rack for PC, displays, servers, network devices, output
devices, etc.
► thermal plotter or equivalent
► desk, chairs, small refrigerator and coffeepot
● Safety equipment (vests, hard hats, etc.)
● Computer, Monitors, Keyboard, Mice, etc.
► Installing and testing interfaces
● HHU? Is there a hand-held unit? (not currently)
● Source controllers?
● Other 3rd party equipment?
● Shot equipment?
● Two-way radios
Preparing the equipment
Making any equipment modifications
Transporting equipment to the site
● Best practices
2.3 At the Site
Prepare the Dog House / CSS HW & SW while the units (sensors & WRUs) are
being placed in the field.
2.3.1 Set Up the Dog House
Set up the following in the dog house:
● Hardware
● Central Server (maybe refer them to the SW chapter)