Layout
At the Site
Charging batteries
Charging Rack/# of batteries (10?)
Charging Times
Updating software in the central and ground units (maybe refer them to the
sw chapter).
List of non-WS equipment:
Dog House
power source (diesel, benzene or other type of fueled generator)
heating, cooling and ventilation system
antenna masts for voice radio, data telemetry, source control, and
possibly satellite phone and/or internet
shock-mounted rack for PC, displays, servers, network devices, output
devices, etc.
thermal plotter or equivalent
desk, chairs, small refrigerator and coffeepot
Safety equipment (vests, hard hats, etc.)
Computer, Monitors, Keyboard, Mice, etc.
Installing and testing interfaces
HHU? Is there a hand-held unit? (not currently)
Source controllers?
Other 3rd party equipment?
Shot equipment?
Two-way radios
Preparing the equipment
Making any equipment modifications
Transporting equipment to the site
Best practices
2.3 At the Site
Prepare the Dog House / CSS HW & SW while the units (sensors & WRUs) are
being placed in the field.
2.3.1 Set Up the Dog House
Set up the following in the dog house:
Hardware
Central Server (maybe refer them to the SW chapter)