User's Manual
Table Of Contents
Draft
RT 1000 v1.0 14 Deployment Guide R00.f
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
2
Layout
2.1 Overview
This chapter describes how to prepare (mobilization) and layout (install) the
ground electronics.
2.2 Mobilization
2.2.1 Prerequisites
Define
Survey
Back haul plan
other?
2.2.2 Getting Ready
Possible topics for this section (basically collect all the pieces you need for the
job):
List of WS equipment:
● WRU
● LTU
● BSU
● Antennas
● Geophones
● Batteries
NOTE
Please refer to Table 8–1 Antenna Specifications, on page 29 for the list
of supported antennas. Use of accessories other than those specified in
this document is not supported or warrantied.