User's Manual
56 RT System 2 v2.3 Deployment Guide R01.i
© 2010-2014 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
Ɣ NanoStation radio installation – While the
mast is resting on the ground, slide the
following on the mast:
Ź Mast guy ring [M-4]
10 Attach and tighten the following:
Ɣ Bullet radio installation:
Ź Bullet radio antenna brackets and
antennas [LR-4, LR-5]
Ź Omni antenna bracket [M-5] and
antenna [LR-3]
Table 3–10 How to Set Up the Backhaul
Step Image