User's Manual Part 1

Draft
R01.b RT System 2 v2.3.0 Deployment Guide 61
© 2010-2013 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
Attach the radio cables to the LIU.
Attach the antenna to LIU.
Attach the battery to the LIU.
Table 3–10 How to Set Up the Backhaul
Step Image