User's Manual Part 1
Draft
22 RT System 2 v2.3.0 Deployment Guide R01.b
© 2010-2013 Wireless Seismic, Inc. All rights reserved.
2. Layout
Laying Out the Equipment
2.4.4 Placing the LIU in the Field
The LIU is part of the backhaul configuration. See “3. Backhaul” on page 23 for more
information.
Figure 2–12 Geophone Self-Test
Failure
NOTE
See “D. LED Indicators” on page 161 for an explanation of the LED status and
error conditions.
If a WRU self test fails, the WRU will continue to the next test.
Skip a self-test by tipping the WRU geophone down and then returning it to the
upright position (flat on the ground).