User's Manual Part 1

Draft
RT System 2 v2.3.0 11 Deployment Guide R01.b
© 2010-2013 Wireless Seismic, Inc. All rights reserved.
2
2. Layout
This chapter describes how to prepare (mobilization) and layout (install) the ground
electronics. See the RT System 2 Installation Guide for instructions on setting up the
recording truck equipment and software.
2.1 Prerequisites
In preparation for mobilization, define the following:
Survey
Backhaul plan
2.2 Getting Ready
Collect all of the following:
RT System 2 ground equipment (05-0007):
WRUs
LIUs (see “Backhaul Components” on page 28)
Antennas 5.5 dBi (65-0204)
Geophones
WRU Batteries (0400-001-01)
WRU Dummy Batteries (55-0009)
Antenna Extenders
30 in (762 mm) antenna extender (65-00941) (standard)
10 ft (3 m) M-to-F coax cable (65-0103)
25 ft (7.6 m) M-to-F coax cable (65-0110)
Backhaul Components (see “Backhaul Components” on page 28)
Tools
Manuals
Consumables
Spares (15-0003)
Mast Parts
Base Parts
Guy Lines
NOTE
Please refer to “Antenna Specifications” on page 143 for the list of supported
antennas. Use of accessories other than those specified in this document is not
supported or warrantied.