User's Manual

5Mbps Draft
26 RT 1000 1.5.0 Deployment Guide R03.h
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
2. Layout
Laying Out the Equipment
2.5.2 Assembling the Ground Equipment
This section describes the process to assemble the ground equipment prior to
deployment.
To assemble the ground equipment:
1 Gather the equipment:
WRU or BSU
Antenna
Geophone
Batteries
2 Gather any special tools:
Optional: Nylon grip pliers
Optional: Loctite® 222
3 Attach one or more batteries to the WRU.
Press the battery into the connector.
Flip the bail over the molded area on the end of the battery.
Press the lever until the catch snaps to lock it in place.
WARNING
In order to comply with FCC radio frequency (RF) exposure
requirements, the RT 1000 units must be installed so that a minimum
separation distance of 20 cm is maintained between the antenna(s) and
all persons at all times during normal operation.
WARNING
AVERTISSE
MENT
Afin de se conformer aux normes de la FCC en matière d'exposition aux
radiofréquences (RF), les unités RT 1000 doivent être installées de
manière à garder en permanence une distance minimale de 20 cm entre
la ou les antennes et toute personne en mode de fonctionnement
normal.