User's Manual
5Mbps Draft
12 RT 1000 1.5.0 Deployment Guide R03.h
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
2. Layout
Getting Ready
● One of the following antennas:
► 9 dBi antenna (65-0067)
► 7 dBi antenna (6060-001-01)
► 5 dBi antenna (65-0023)
► 2 dBi antenna (65-0025)
● Geophones
● WRU Batteries (0400-001-01)
● WRU Dummy Batteries (55-0009)
● Battery Charging System (10-0008)
● Battery Charger Shelf (10-0011) (optional)
● Antenna Extenders
● Fiber Backhaul
● Tools
● Manuals
● Consumables
● Spares (15-0003)
► Mast Parts
► Base Parts
► Guy Lines
► Antennas
► Batteries
► Cables
► Connectors
Non-RT 1000 ground equipment:
● Recording truck:
► Power source (diesel, benzene or other type of fueled generator)
► Heating, cooling and ventilation system
► Antenna masts for voice radio, Data telemetry, source control, and
possibly satellite phone and/or internet
NOTE
The LTU includes the Base Station Unit (BSU), the Power over Ethernet
(PoE), the battery, the backhaul, and the mast.
NOTE
The batteries (when fully discharged) require 8 hours of continuous
charging in the battery charger connected to an AC source; therefore,
the battery charger will be located at the staging area or in town.