User's Manual
5Mbps Draft
64 RT 1000 1.5.0 Deployment Guide R03.h
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Removing the Backhaul Equipment
To install two radios on the mast:
1 Prerequisites:
● TBD
● The radios are configured to allow the PoE option (see step 11 on page 59).
● The radios are BOTH configured as mesh POINTS (see step 6 on page 57).
2 Attach two radios to the mast. Refer to the deployment instructions for the
location at which to aim the radio. One should point towards the recording
truck (uplink), and the other should point towards the next remote backhaul
location (downlink).
3 Connect the two radios with a short Ethernet cable: Radio1/LAN 2 to Radio 2/
LAN 1.
4 Connect Radio 1/LAN 1 to the PoE.
3.6 Removing the Backhaul Equipment
TBD
3.7 Use Cases or Example Deployments
This section shows a few example deployments.