User's Manual
Table Of Contents
Preliminary
R01 RT 1000 v1.0 Deployment Guide 29
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Demobilization
Disassemble the Ground Equipment
2 Remove the antenna from the unit.
● Steps TBD.
3 Remove the geophone from the unit.
● Steps TBD.
4 Remove one or more batteries from the unit.
● Steps TBD.
5 Secure the equipment in the transport vehicle.
Image showing antenna installation TBD.
Figure 7–3 Installing the Antenna
Image showing geophone installation TBD.
Figure 7–4 Installing the Geophone
Image showing battery installation TBD.
Figure 7–5 Installing the Battery