User's Manual
Table Of Contents
Preliminary
R01 RT 1000 v1.0 Deployment Guide 27
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Demobilization
Undeploy the Ground Equipment
3 Place the unit flat in the transportation vehicle. on the ground as shown in the
following figure. The unit shuts down. The LEDs on the top of the unit are off:
Figure 7–1 Power Off the Unit