User's Manual

Preliminary
R01 RT 1000 v1.0 Deployment Guide 25
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Rolling
Rolling the Station
6.1.2 Process
This section describes how to move the equipment from one location to another.
To roll the equipment:
1 Follow the instructions in “Undeploy the Ground Equipment” on page 26 to
undeploy ground equipment.
2 Move the equipment to the new location, being sure to secure it firmly in the
transport vehicle and perform any desired maintenance (such as replacing
depleted batteries).
3 Follow the instructions in “Lay Out the Equipment” on page 15 to redeploy the
equipment.
6.2 Rolling the Station
TBD
6.2.1 Overview
TBD
6.2.2 Process
TBD