User's Manual
Manuals
Brands
Wireless Seismic Manuals
Electronics
Wireless Remote Unit
11
12
13
14
15
16
17
18
19
20
Table Of Contents
List of Figures
List of Tables
Overview
1.1 About this Guide
1.2 Who Should Use this Guide
1.3 Other Documents
1.4 Getting Help
Layout
2.1 Overview
2.2 Mobilization
2.2.1 Prerequisites
2.2.2 Getting Ready
2.2.3 Prepare the Equipment
2.3 At the Site
2.3.1 Set Up the Central Recording System
2.3.2 Lay Out the Equipment
2.3.2.1 Prerequisites
2.3.2.2 Assemble the Ground Equipment
2.3.2.3 Place the Ground Equipment in the Field
Software
3.1 Overview
3.2 Installing the Software
3.3 Upgrading the Software
3.4 Upgrading the Firmware
Backhaul
4.1 Overview
Testing and Maintaining the Equipment
5.1 Overview
5.2 Testing the Layout
5.2.1 Line Tests
5.2.2 Source Control Tests
5.2.3 Acquisition Parameter Testing
5.2.4 Built-In-Self-Test (BIST)
5.3 Maintaining the Equipment
5.3.1 Units
5.3.2 Antennas
5.3.3 Geophones
5.3.4 Cautions
Rolling
6.1 Rolling the Line
6.1.1 Overview
6.1.2 Process
6.2 Rolling the Station
6.2.1 Overview
6.2.2 Process
Demobilization
7.1 Overview
7.2 Undeploy the Ground Equipment
7.3 Disassemble the Ground Equipment
Troubleshooting
8.1 Overview
Legal Information
9.1 FCC Rules and Regulations Compliance
Glossary
Index
Preliminary
R01
RT 1000 v1.0 Deployment Guide
17
© 2010-2011 Wireless Seismic,
Inc. All rights reserved.
Layout
At the Site
3
Place the unit flat on the ground
as shown in the following figure:
Figure 2–7 Power on the Unit
1
...
...
15
16
17
18
19
...
...
35