Layout
2.1 Overview
This chapter describes how to prepare (mobilization) and layout (install) the
ground electronics.
2.2 Mobilization
Mobilization is the physical preparation for moving to the seismic data
acquisition site.
2.2.1 Prerequisites
In preparation for mobilization, define the following:
Survey
Back haul plan
TBD
2.2.2 Getting Ready
Collect all of the following:
RT 1000 ground equipment:
● WRUs
● LTUs
NOTE
Please refer to Table 9–1 Antenna Specifications, on page 31 for the list
of supported antennas. Use of accessories other than those specified in
this document is not supported or warrantied.
NOTE
The LTU includes the Base Station Unit (BSU), the Power over Ethernet
(PoE), the battery, the backhaul, and the mast.