User's Manual
Wireless Matrix SDT-5000 Installation and User Guide
Doc. 020-331-0002v1.1 8/31
Pre-Installation Considerations
You should perform a pre-installation evaluation before installing any SDT-5000 components. A
pre-installation evaluation will provide information about how and where to install the SDT-5000
and will help identify potential installation issues. During the pre-installation evaluation, you should
estimate available space for component placement, cable routing and inspect the location to
determine the most suitable area for an antenna installation. After completing a pre-installation
evaluation, you should know where to locate components, how to route cabling and what additional
mounting accessories, wiring and cabling conduits will be required for the installation.
General Considerations
Check for obstructions at the site below ground level when digging holes for the units
mounted on poles.
Stay at least 20 cm away from an operating antenna when you are above the level of the
antenna base.
Do not remove the antenna cover: removing the antenna cover will void the product
warranty.
Do not paint the antenna: paint on the antenna will void the product warranty. Paint may
also interfere with signal transmission or reception.