User guide

77
Inspection and Start-up Checklists 检查和启动检查清单
Unit received undamaged
完整无损地器材单元接受
Unit received complete as ordered including accessories
收到完整的器材包括附件
Handling and Installing 搬运和安装
Unit mounted on solid level surface
装置安装在坚实平坦的表面
Sufficient space allowed for access to unit and accessories Proper electrical service
provided
设备周围有
足够的空间,电力供应正确
Hot water provided to humidifier
加湿机热水供应
Drain lines and trap installed properly
排水管线和安装正确的陷阱
Ductwork, fittings and grilles installed properly
管道,配件及格栅正确安装
Al
l cold duct surfaces insulated
所有冷风管道表面绝缘
Low ambient control included if freezing condition present No obstructions to air flow to
condenser
低温环境控制考虑到冰冻状态,冷凝器空气 流动没有障碍物干扰。
Starting-up the Unit 启动主机
General visual inspection looks good All wiring connections checked
一般目视检查过关 所
有线路连接检查过关
All ducts, grilles and panels in place
通风管道,格栅和盖板
全部到位道。
Start unit
启动主机
Check ducts and connections for air leaks
检查管道和连接处空气泄漏
Balance air distribution
平衡空气分布
Confirm condenser airflow is unrestricted
确认冷凝器气流不受限制
Verify cooling and heating operation
检查冷却和加热操作
Check for excessive noise or vibration
检查噪音或震动过大