User guide

n
Mind the following minimum clearances also for vertical mounting to
ensure sufficient ventilation (see page 10):
Forward: 100 mm,
Backward: 60 mm
Sideways (left): 50 mm
n
A surface made of nonflammable material (e.g. concrete or metal) must
be located underneath the vertically mounted power supply unit.
n
Recommendation: Mount the device with the side of the power supply
unit (= side without ventilation slots) facing upwards.
Moun ting the Ca ble Co ver
Before mounting the optional cable cover, you should first remove the cable
openings where necessary. This depends on the cables which you wish to
lay.
Tools are not required as the plastic parts can be removed by hand.
12 BEETLE /M-II plus