OWNERS MANUAL EMERGENCY TRANSFER SERVICE KIT INSTALLATION, OPERATION, and MAINTENANCE INSTRUCTIONS
SAVE THESE INSTRUCTIONS This manual contains important instructions that should be followed during installation and maintenance of the generator and batteries. Read and understand all instructions in the manual before starting and operating a generator set with this transfer system USING THIS MANUAL Congratulations on your choice of a WINCO Emergency Transfer Kit.
SAFETY INFORMATION b. c. This engine generator set has been designed and manufactured to allow safe, reliable performance. Poor maintenance, improper or careless use can result in potential deadly hazards; from electrical shock, exhaust gas asphyxiation, or fire. Please read all safety instructions carefully before installation or use. Keep these instructions handy for future reference. Take special note and follow all warnings on the unit labels and in the manuals.
EMERGENCY TRANSFER SERVICE The Emergency Transfer Service kit includes a UL Approved Square 'D' manual power isolation switch. When properly installed it will safely disconnect the normal power service from your home emergency electrical circuits and reconnect them to a portable generator. It is not designed to transfer your whole electrical system, only selected circuits you need powered during a power failure (i.e. furnace, refrigerator, freezer and minimal lighting).
INSTALLATION The first step will be to install the 'J' box on the outside of the house and the Emergency Load Distribution Panel next to your existing distribution panel. Remember the circuits you take out of the main panel will be reinstalled in the emergency panel, so these should be as close together as possible. Next you need to install a two pole (240 Volt) circuit breaker in the current distribution panel.
Next you will need to install your load circuit breakers in the emergency panel. Again you can use any combination of breakers that you want. The emergency panel uses Square "D" circuit breakers type QO, if you need to use the tandem breakers on the 120 circuit they are type QO-T. The final step will be to move your load leads from the main distribution panel to the emergency panel. TESTING THE SYSTEM 1.
EMERGENCY TRANSFER SERVICE KIT 30 & 60 AMP PARTS LIST REF # 60707-118 PART NUMBER QTY DESCRIPTION 1 2 3 4 5 64482-000 64489-000 64485-000 91720-000 64484-000 REF REF 1 1 1 Box Assembly Service Panel Assembly Panel Padlock Cover 6 6A NI NI NI 64490-000 64490-001 64494-000 56899-004 64495-000 REF REF 1 2 1 Cord Assembly 30A Cord Assembly 60A Load Center 100A Circuit Breaker 60A, 240V Interlock NI NI NI NI NI 64496-000 64492-000 300137 92157-001 98400-000 1 1 1 1 12FT Ground Bar Kit Plug, NEMA
12 MONTH LIMITED WARRANTY WINCO, Incorporated warrants to the original purchaser for 12 months or 1000 hours which ever occurs first, that goods manufactured or supplied by it will be free from defects in workmanship and material, provided such goods are installed, operated and maintained in accordance with WINCO written instructions. WINCO’s sole liability, and Purchaser’s sole remedy for a failure under this warranty, shall be limited to the repair of the product.