A. The Contractor shall keep all raceways and conduit system openings closed by
means of plugs or caps to prevent the entrance of foreign matter and cover all
fixtures, equipment and apparatus as required to protect them against dirt, water,
chemical or mechanical damage both before and after installation.
B. Plugs and caps shall be of such types as to prevent transmission of flood water
through any duct, conduit or raceway. Any fixtures, equipment or apparatus
damaged prior to final acceptance of the work shall be restored to its original
condition or replaced by the Contractor. At completion, fixtures and equipment
shall be thoroughly cleaned.
C. The Contractor shall be held responsible for all damage done until his work is
fully and finally accepted.
1.06 Coordination
A. The Contractor shall be held responsible for the proper coordination of all phases
of the work under this Contract.
B. It shall be the responsibility of the Contractor to coordinate the work and
equipment as specified herein with work to be performed and equipment to be
furnished, under other sections of the specifications in order to assure a complete
and satisfactory installation.
1.07 Quality of Equipment
Quality shall be of the best grade for each type or class, even through such quality
may not be stated specifically in the specifications. All materials and products shall
be new and manufactured by well known firms and shall be sound and uniform in
quality, size, shape, color and texture and shall be free from cracks, warpage, or
their defects. Energy consuming equipment shall be of the energy saving type,
wherever relevant and applicable.
1.08 Temporary Power
A. The Contractor shall furnish and install all temporary electrical facilities,
including lamps, required for construction and safety operation. All such
equipment shall remain the property of the Contractor and shall be removed when
permanent connections have been completed. Where it is determined, during
construction, that the temporary facilities, as installed, interfere with other