Specifications

NAIROBI OPERATIONAL HUB
UNOPS Building, UN Lane, Off UN Avenue Tel: +254 20 7621120
P.O Box 783,Village Market, 00621 E-mail: info@unops.org
Nairobi, Kenya Website: www.unops.org
UNOPS is ISO 9001 certified
C. The D/G Sub-Contractor shall be fully responsible for the satisfactory
operation of the D/G installation during the Maintenance and Guarantee
Period. He shall carry out necessary inspection, preventive maintenance
and testing to keep the set ready all the time. The set shall function
satisfactorily during power failures. The D/G Sub-Contractor shall carry
out routine testing of the installation once in every two weeks throughout
the maintenance and Guarantee Period. The testing shall be carried in
presence of Engineer. The Sub-Contractor shall himself provide all
electrical and mechanical spare parts, grease, lubricating oils, touch-up
paints etc... required for the maintenance of the D/G installation. The
power shall be responsible only for providing diesel oil as and when
required. The D/G Sub-Contractor shall prepare log-books listed full
details of maintenance work and each log-book entry shall be
countersigned by the Engineer.
2.08 PROVISIONS FOR BUILDING CONTROL & MANAGEMENT SYSTEM
The Following signal facilities shall be available on the system for interfacing
With the building control and management system:
- ATS mode
- Common fault
- High coolant temperature
- Low oil Pressure
- Cranking failure
- Low level daily fuel tank
- Low level underground storage fuel tank