Specifications

NAIROBI OPERATIONAL HUB
UNOPS Building, UN Lane, Off UN Avenue Tel: +254 20 7621120
P.O Box 783,Village Market, 00621 E-mail: info@unops.org
Nairobi, Kenya Website: www.unops.org
UNOPS is ISO 9001 certified
Service Facilities
1. Indicate the nearest location from which service facilities and spare
parts may be obtained after the guarantee period.
Test Reports
1. Submit certified copies of data obtained during factory test of the
engine generator test.
Operation and Maintenance Data
1. Submit certified copies of data obtained during factory tests of the
engine generator test.
a) Manuals for generator set.
b) Detailed instruction books.
c) Operator's manuals.
d) Maintenance schedules.
e) Part catalogues.
2. Submit 3 copies of the following:
a) Complete instruction covering the operation of the engine
generator set and associated equipment.
b) A manual covering engine operation and maintenance.
3. Fix one copy of the composite wiring diagram of the emergency
transfer system inside the transfer switch compartment door and
another in the generator control panel.
4. Fix as-built print each generator set, frames behind non-glare
plexiglass, on a wall near the generator control room.
Spare Parts
1. Provide the spare parts for 2 years operation and maintenance,
properly preserved and packed in a suitable steel box with a lock and
two keys marked "Spare Parts: Engine Generator Unit".
Product Delivery, Storage and Handling
1. All generator equipment-using eyes, yokes and skids provided by the
manufacturer.