Installation Guide
1of2
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal.
(8)A19MediumBase100WbulbMaximum,bulbnotincluded.
MinimumHangingHeightis24”,MaximumHangingHeightis51”.
30-45minutes
Identifyandinspectallpartsbeforebeginninginstallation.Checkpackagecontentlistanddiagramsbelowtoensureallpartsare
present.Ifanypartsaremissingordamaged,donotattempttoassemble,install,oroperatethefixture.MissingParts?Contactyouroriginalplaceof
purchase.
LightSource:
FixtureHangingHeight:
EstimatedAssembly Time:
Preparation:
ToolsRequired:Flatheadscrewdriver,Phillipsscrewdriver,pliers,wirecutters,wirestrippers,electricaltape,safetyglasses.
Package Contents
Hardware Contents
BB
DD
Ceiling
Canopy
x1
CC
Fixture Chain
x4
Quick Link
x8
AA
Crossbar
x1
Assembly
A
Fixture Body
x1
STEP 1 - Install the Crossbar Assembly to Outlet Box and Adjust
the length of the Nipple
A. Attach the Crossbar Assembly (AA) to the Outlet Box with the head
of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included), tighten until snug
B. Adjust the hex nut and lock washer underside of the crossbar to the
middle of the nipple.
C. Remove the and Hex Nut from the Nipple. Place the
Ceiling Canopy over the Nipple against the ceiling to determine the
correct position of the nipple. Thread the Finial onto the Nipple.
Adjust the nipple to allow the Ceiling Canopy to rest against the
ceiling when held in place by the .
D. Remove the and the Ceiling Canopy(DD). Tighten the lock
washer and the hex nut against the crossbar to secure in place.
.
Lock Ball
Lock Ball
Lock Ball
Outlet Box Screw
(not included)
Hex Nut and
Lock Washer
Outlet Box
Green Ground Screw
AA
Lock Ball
Figure 1
Nipple
Hex Nut
DD
CC
Supply Wires
and Ground Wire
BB
CC
DD
A
STEP 2 - Install Fixture Chains
a. Adjust the Fixture Chain (BB) to your desired length by removing
the links if needed.
b. With the Fixture Chain (BB) not attached to the fixture loops and
the ceiling loops underside of the Ceiling Canopy (DD), pull the
supply wires and ground wire through the Fixture Chain (BB)
alternating links. After the wires are through the Fixture Chain
(BB), pull the supply wires and ground wire through the Ceiling
Canopy (DD).
c. Attach one ends of the Fixture Chains (BB) to fixture loops with
Quick Links (CC) as shown. Lift the fixture and Fixture Chains (BB)
up and attach the other ends of the Fixture Chains (BB) onto the
ceiling loops underside of the Ceiling Canopy (DD) with the rest
Quick Links (CC).
Suggested rods and chain length for Ceiling height :
8’ ceiling : use 30 links of chains and 4 quick links
9’ ceiling : use 40 links of chains and 4 quick links
Installation Guide


