Technical Specifications

ICC-ES Evaluation Reports are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed
as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICC Evaluation Service, LLC, express or implied, as
to any finding or other matter in this report, or as to any product covered by the report.
Copyright © 2018 ICC Evaluation Service, LLC. All rights reserved. Page 5 of 5
ICC-ES Evaluation Report ESR-3485 FBC Supplement
Revised October 2018
This report is subject to renewal October 2020.
www.icc-es.org | (800) 423-6587 | (562) 699-0543 A Subsidiary of the International Code Council
®
DIVISION: 05 00 00METALS
Section: 05 52 00Metal Railings
REPORT HOLDER:
ULTRALOX™
EVALUATION SUBJECT:
ALUMINUM RAILING SYSTEM SERIES V800, C800, M600, I800, A800, and O800
1.0 REPORT PURPOSE AND SCOPE
Purpose:
The purpose of this evaluation report supplement is to indicate that Aluminum Railing System Series V800, C800, M600,
I800, A800, and O800 recognized in ICC-ES master evaluation report ESR-3485, has also been evaluated for compliance
with the codes noted below.
Applicable code editions:
2017 Florida Building CodeResidential
2.0 CONCLUSIONS
The Aluminum Railing System Series V800, C800, and M600 described in Sections 2.0 through 7.0 of the master evaluation
report ESR-3485, complies with the Florida Building CodeResidential, provided the design and installation are in
accordance with the 2015 International Residential Code
®
provisions noted in the master report.
Use of the Aluminum Railing System Series V800, C800, M600, I800, A800, and O800 for compliance with the High-
Velocity Hurricane Zone provisions of the Florida Building CodeResidential has not been evaluated and is outside the
scope of this evaluation report.
For products falling under Florida Rule 9N-3, verification that the report holder’s quality-assurance program is audited by a
quality-assurance entity approved by the Florida Building Commission for the type of inspections being conducted is the
responsibility of an approved validation entity (or the code official, when the report holder does not possess an approval by
the Commission).
This supplement expires concurrently with the master report, issued October 2018.