User manual
Specifications  LükWerks User Guide 
86 
Wall and Ceiling Mount Installation 
Installing the Luk Camera Wall and Ceiling Mount is simple. Use the recommended tools and drilling template 
below. As always, use caution to avoid injury. 
Recommended tools: Screwdriver, electric drill. 
Surface  Pilot Hole Drill Size  Pilot Hole Depth 
Softwood  1.6 mm (1/16”)  1.2 cm (1/2"0 
Hardwood  2.0 mm (5/64”)  1.2 cm (1/2") 
Wallboard (use anchor)  5.0 mm (3/16”)  2.3 cm (7/8”) 
Pre-drill pilot holes before securing the camera to the surface. For soft, hollow surfaces such as wallboard, 
sheet rock and drywall, use the provided plastic anchors. 
WALL MOUNTING DRILLING TEMPLATE 
The illustration is drawn to a one-to-one scale, which means it provides the exact dimensions required to 
mount the unit. 
Drill Holes in 
These Positions 










