Datasheet
components • contextuAl modify tAbs
|
1065
components
detail, 714
adding, 714 – 718, 714 – 718
arranging elements, 718 – 719, 718 – 719
families, 725 – 733, 726 – 732
groups, 723 – 724, 724
linework, 725, 725
Repeating Detail Component,
719 – 723, 720 – 722
visibility, 733 – 734, 733 – 735
families, 29, 597
creating, 601 – 603, 601
dimensions, 611 – 612, 611 – 612
hosted vs. nonhosted, 602 – 603, 602 – 603
insertion points, 603 – 604, 604
materials, 610 – 611, 610 – 611
object styles and subcategories,
612 – 613, 612 – 613
reference points, planes, and lines,
605 – 607, 605 – 607
type and instance parameters, 613 – 614, 614
visibility settings, 607 – 609, 608 – 609
composite views, 987 – 988, 988 – 989
Compound Ceiling family, 577
compressing animated solar studies, 356, 356
computations
distances, 721
room area, 740 – 741, 740 – 741
computer numerical control (CNC),
979 – 981, 979 – 981
Concept Curtain Walls, 539 – 540, 539 – 540
Conceptual Constructions dialog box,
360 – 362, 360
Conceptual Design Environment (CDE), 540
Conceptual Design tool
overview, 339
sustainable design
concepts, 339 – 340
daylighting. See daylighting
energy modeling, 358 – 368, 358, 364 – 368
schedules, 340 – 346, 341 – 346
sun shading and solar paths. See sun and
solar studies
conceptual energy analysis (CEA) tool,
359 – 362, 359 – 361
Conceptual Mass panel, 265
conceptual massing, 839
concrete masonry units (CMUs), 112 – 113, 112
concurrent design, 382
conditions for stairs, 677 – 683, 677 – 683
Configure UV Grid Layout command, 541
Configure Weather Data dialog box, 375, 376
conflicts in groups, 405, 405
consistency
drawing sheets, 151
multiple packages, 152
Consistent Colors view, 455, 455
Constrain option, 68
constraints
dimensions, 78 – 79, 78 – 79
movement, 68
parametric projects, 829 – 834, 830 – 835
construction, 863
builders, 873 – 874
contractors
J. H. Findorff & Son case study,
874 – 880, 875 – 880
Tocci Building Corporation case study,
881 – 886, 881 – 886
digital markups, 868 – 872, 870 – 871
film and stage, 981, 981
modeling
assemblies, 891 – 892, 892 – 893
overview, 887
parts, 887 – 891, 888 – 891
revisions, 863 – 868, 864 – 868
Construction Week setting, 384
constructors, class, 956, 959 – 960
consultants, 193
coordination with. See coordination
preparation for, 193 – 195, 194
content, 29, 29
custom, 126
recycled, 341 – 343, 341 – 343
scheduled, 42
context menus, 65 – 66, 65
Contextual Modify tabs, 59, 59
937495bindex.indd 1065 4/18/11 10:18:51 PM