Datasheet
inserts for stAcked wAlls • Joint GAp distAnce settinG
|
1079
inserts for stacked walls, 525, 525
Inside option for repeating detail, 721
instance parameters
family components, 613 – 614, 614
overview, 30, 30
purpose, 799
railings, 667
roofs, 581, 581
insulation, 723, 723
Insulation tool, 723, 723
“Integrated Project Delivery: A Guide”, 195
integrated project delivery (IPD) environment
contractors, 874
overview, 194 – 195
Tocci Building Corporation case
study, 882 – 884
intelligent bonds, 196
interface. See user interface
Interference Check dialog box, 223, 223
Interference Check tool, 196 – 197, 222
interference checking, 220
architect link, 198
exercise, 222 – 223, 223 – 224
purpose, 196 – 197
tools, 222
Interference References button, 888
Interference Report window, 223, 224
Interior behavior of walls, 507
interior elevations, 36
interior illumination. See daylighting
Interior wrap option for walls, 505
intermediate adoption, 11, 11
International Alliance for Interoperability
(IAI), 255
interoperability, 225
BIM curve, 225, 226
exporting. See exporting
importing. See importing
Intersecting Named References dialog box,
888, 888
intersections for in-place solids, 296 – 297
intersects, dividing surfaces with,
542 – 543, 543
Intersects List option, 543
intervals, saving at, 178 – 179, 178
intuitive massing, 262, 279 – 280, 280
in-place solids, 294 – 309, 294 – 309
in-place surfaces, 280, 280 – 281
pattern-based system, 284 – 294, 285 – 293
wall by face, 281 – 284, 281 – 284
investment in BIM, 13 – 14
<Invisible> lines, 708 – 709, 725
IPD (integrated project delivery) environment
contractors, 874
overview, 194 – 195
Tocci Building Corporation case
study, 882 – 884
ironCAD tool, 974
Issued setting, revisions, 865
IT virtualization advantages, 918 – 919
Itemize Every Instance option, 157, 752, 756
J
J. H. Findorff & Son case study, 874
construction stage, 878, 878
preconstruction planning,
874 – 877, 875 – 877
set-out drawings, 878 – 880, 878 – 880
Japanese temple set, 1013, 1013
Join Condition options, 536
Join Geometry tool
floor finishes, 576
forms, 620
poches, 466
working with, 79, 79
Join/Unjoin Roof tool, 587
joins
handrails, 662 – 666, 663 – 666
phasing, 383 – 384, 383 – 384
walls
editing, 519 – 521, 519 – 521
to floors and roofs, 79, 79
limitations, 210
links vs. groups, 408, 408
Joint Gap distance setting, 76
937495bindex.indd 1079 4/18/11 10:18:53 PM