Installation Manual

Use one WEEB-WMC per ballast pan
to bond pans to Power Beam rail.
Tighten each flange nut
to 35 ft-lb / 47.5 N-m
using general purpose
anti-seize on threads.
Use a large washer under
every flange nut that secures
a WEEB-WMC to the Power
Beam rail. Tighten each flange
nut to at least 15 ft-lb / 20.5 N-m
using general purpose anti-seize
on threads.
Use a WEEB-WMC at each
splice plate mounting hole.
Tighten each flange nut to
at least 15 ft-lb / 20.5 N-m
using general purpose
anti-seize on threads.
Ballast Pans and Rail Splices
Wiley Electronics LLC. 2006-2010

All Rights Reserved
3
If running wire outside of conduit and in or along the ballast tray, the ballast trays may
be connected to equipment ground by using one WEEB-WMC at one of the
connection points.