User Manual

2
CAUTION HOT LIQUID, Scalding may occur. Avoid splashing.
BREWING INSTRUCTIONS
1. Brewer should be ON (Conrm at rear toggle switch, then press ON/OFF button) and Ready-to-Brew displayed.
2. Place lter in brew basket. Pour leaf tea into
basket.
3. Slide brew cone into brew rails. Place tea
container on brew deck.
4. Select a BREW button and press to start a
brewcycle.
Your Curtis ADS System is Factory Pre‑Set for Optimum Performance.
After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.
The control displays . Press ON/OFF button and the screen will display . After three seconds, is displayed.
Water will ll the tank (approximately 2-3 minutes depending on water ow rate). When the proper level is reached will appear on the screen.
It takes approximately 20 minutes to reach setpoint temperature of 204°F.
Control will display when temperature reaches the setpoint (204°F). Unit is now ready to brew.
SETUP STEPS (Continued)
4 Turnonthemainpowerswitch(bottomtoggleswitch,behindthebrewer).Theheatingtankwillstarttoll.Whenthewater
levelinthetankrisestothecorrectvolume,theheatingelementwillenergizeautomatically.Thiseliminatesthepossibilityof
elementburnoutcausedbyanemptytank
5. TurnOFFthesweetenerpump(topswitch,behindthebrewer).
6. Theheatingtankwillrequire20to30minutestoreachoperatingtemperature(204°F)indicatedbyREADY-TO-BREWonthe
LCDreadout.
7. TurnONthesweetenerpumpatthetoggleswitch,behindthebrewer.Thepumpwillprimethesweetenerproductthroughthe
clear tubing.
8. Runonefullbrewcycle,topurgethewaterlinesandvalvesofair.Fivesecondsofdilutionwateratthebeginingofeachbrew-
cycle is a normal function. This is a default of the system.
9. Theunitisreadyforthenextbrew.
CURTIS
READY TO BREW
CURTIS
<TCT G3>
CURTIS
CURTIS
FILLING
CURTIS
HEATING