Manual
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so that the unit
can be moved for cleaning.
2. Thisunitmustbeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,stateand
local codes.
3.Waterpipeconnectionsandxturesdirectlyconnectedtoaportablewatersupplyshallbesized,installed
andmaintainedinaccordancewithfederal,state,andlocalcodes.
3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4. Once power has been supplied to the unit, ip the toggle switch to the ‘ON’ position (located on the rear of the unit),
the water tank will begin to ll. When the water level in the tank reaches the probe, the heating element(s) will turn on.
5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory setting of
200°F). Where applicable, turn on the Universal Control Module (UCM). When the unit reaches operating temperature,
it will display “READY TO BREW”.
NOTE:Awaterltrationsystemmustbeusedtohelpmaintaintrouble-freeoperation.Inareaswithextremelyhard
water,wehighlyrecommendtheuseofaCurtisapprovedwaterlter.Forourfulllineoflters,pleaselogontowww.
wilburcurtis.com.Awaterltrationsystemwillgreatlyprolongthelifeoftheunitandenhancethequalityandtasteof
the product.
SETUP STEPS
1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet tting on the rear of the unit. Water volume ow to the machine should be
consistent. Use tubing sized sufciently to provide a minimum ow rate of one gallon per minute.
Symbols
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
Models Included:
• TCTS10600
• TCTS10631
• TCTS106127
• RTB3
• RTB30061
The Curtis G3 Brewer is Factory Pre-Set and Ready to Go… Right from the Box.
Following are the Factory Settings for the G3 Iced Tea Brewer.
• Brew Temperature = 204°F
• Brew Volume = Set to dispensing vessel requirements (2.2 liters)
Generally there will never be a reason to change the G3/Gold Cup Series default settings. However, should you need to
make slight adjustments to meet your brewing needs, programming instructions are provided later in this manual.
System Requirements:
• Water Source 20 – 90 PSI. Minimum ow rate of ½ gpm (1 gpm preferred ow rate).
• Electrical: See electrical schematic on page 8.
IMPORTANT:
After setup, run a FULL
brewcycle. Place a tea
container to catch both hot water
from the brewcone and dilution water
from spout on the front cover.
Wilbur Curtis Company, inC.
Service Manual – Iced Tea Brewer-RC
Important Safeguards/Symbols
This appliance is designed for commercial use. Any servicing other than cleaning and preventive maintenance should be
performed by an authorized Wilbur Curtis service technician.
• Do NOT immerse the unit in water or any other liquid
• To reduce the risk of re or electric shock, do NOT open service panels. No user serviceable parts inside.
• Keep hands and other items away from hot surfaces of unit during operation.
• Never clean with scouring powders, bleach or harsh chemicals.
CAUTION: DO NOT
connect the unit to hot
water. The inlet valve is
not rated for hot water.
CAUTION: Follow this
setup procedure before
attempting to use this
unit. Failure to follow these instruc-
tions can result in injury and/or void
of warranty.
CAUTION: Equipment
must be installed to
comply with applicable
federal, state, and local plumbing/
electrical codes having jurisdiction.
ISO 9001:2008 REGISTERED
WILBUR CURTIS CO., INC.
6913 West Acco Street
Montebello, CA 90640-5403
For the latest information go to
www.wilburcurtis.com
Tel: 800-421-6150
Fax: 323-837-2410
Forthelatestspecicationsandinformationgotowww.wilburcurtis.com
TechnicalSupport:1-800-995-0417M-F5:30am-4:00pmPT
Email: techsupport@wilburcurtis.com