Manual
2
Your Curtis Brewing System is Factory Pre‑Set for Optimum Performance.
After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.
The control displays . Press ON/OFF button and the screen will display . After three seconds, is displayed.
Water will ll the tank (approximately 2-3 minutes depending on water ow rate). When the proper level is reached will appear on the
screen. It takes approximately 20 minutes to reach setpoint temperature of 200°F.
Control will display when temperature reaches the setpoint (200°F). Unit is now ready to brew.
<GEMINI TWIN>
WILBUR CURTIS
CURTIS CURTIS
FILLING
CURTIS
HEATING
CURTIS
READY TO BREW
Program
Menu Tree
Allprogrammingselectionsareperformedwiththethreecenterbuttons.
Thesymbolsbelowthebuttonsare:
ScrollLEFT
SELECTIONorENTERtosavenewparameter
ScrollRIGHT
IMPORTANTNOTE: