User guide

1
Models Included:
ALPHA 3GT Fresh-Trac
ALPHA 6GTN Fresh-Trac
Technical Support: 1-800-995-0417 M-F 5:30am-4:00pm PT
Email: techsupport@wilburcurtis.com
3. Connect the unit to electrical outlet with appropriate amperage rating (see serial tag on machine).
4. Once power has been supplied to the unit, ip the toggle switch to the ‘ON’ position (located on the rear of
the unit), the water tank will begin to ll. When the water level in the tank reaches the probe, the heating
element(s) will turn on.
5. Water in the heating tank will require approximately a half hour before reaching operating temperature (factory
setting of 200°F). Where applicable, turn on the Universal Control Module (UCM). When the unit reaches
operating temperature, it will display “READY TO BREW”..
Wilbur Curtis Company, inC.
Service Manual – ALPGT Fresh-Trac
Important Safeguards/Conventions
This appliance is designed for commercial use. Any servicing other than cleaning and preventive maintenance
should be performed by an authorized Wilbur Curtis service technician.
• Do NOT immerse the unit in water or any other liquid
• To reduce the risk of re or electric shock, do NOT open service panels. No user serviceable parts inside.
• Keep hands and other items away from hot surfaces of unit during operation.
• Never clean with scouring powders, bleach or harsh chemicals.
Symbols
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
The Curtis Alpha GT is Factory Pre-Set and Ready to Go… Right from the Box.
Following are the Factory Settings for the Alpha Fresh-Trac:
• Brew Temperature = 200°F
• Brew Volume = Set to vessel requirements (60 oz).
System Requirements:
• Water Source 20 – 90 PSI (minimum ow rate of ½ GPM)
• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.
SETUP STEPS
1. The unit should be level (left to right - front to back), on a secure surface.
2. Connect the water line to the water inlet tting on the rear of the unit. Water volume ow to the machine
should be consistent. Use tubing sized sufciently to provide a minimum ow rate of ½ gallon per minute
(1 gallon per minute preferred).
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) is required so
that the unit can be moved for cleaning.
2. Thisunitmustbeinstalledwithadequatebackowprotectiontocomplywithapplicablefederal,
state and local codes.
3.Waterpipeconnectionsandxturesdirectlyconnectedtoaportablewatersupplyshallbe
sized,installedandmaintainedinaccordancewithfederal,state,andlocalcodes.
CAUTION: DO NOT
connect the unit to
hot water supply.
The inlet valve is not rated for
hot water.
CAUTION: Follow
this setup procedure
before attempting
to use this unit. Failure to
follow these instructions can
result in injury and/or void of
warranty.
ISO 9001:2008 REGISTERED
WILBUR CURTIS CO., INC.
6913 West Acco Street
Montebello, CA 90640-5403
For the latest information go to
www.wilburcurtis.com
Tel: 800-421-6150
Fax: 323-837-2410
CAUTION:
Equipment must be
installed to comply
with applicable federal, state,
and local plumbing/electrical
codes.
NOTE: A water ltration system must be used to help maintain trouble-free operation. Air must be
purged from the cartridge prior to connection to equipment. In areas with extremely hard water,
we recommend the use of a Curtis approved water lter. For our full line of lters, please log on to www.
wilburcurtis.com.

Summary of content (12 pages)