Manual

6 Commissioning, operation
72 WIKA Operating Instruction, Pascal ET and Pascal ET/IS
GB
6.6 Report
To create a report one channel has to be set as REF (Reference) and another one as DUT (Device
Under Test): reference signal and direct measurement (or manual input by keyboard) are required.
For the REFERENCE: remember to set the range equivalent to the one of the DUT. When the
channel is assigned as reference, the symbol REF will appear.
For the DUT: remember to define the max error and the declaration. A bargraph will be displayed
on the DUT channel. When the channel is device under test, the symbol DUT will appear.
Press REPORT, the below menu is displayed:
VIEW RPT View Reports
SETUPRPT Set up Reports
DEL.RPTS deletes all the Reports
VIEW PRC View Procedures
SETUPPRC Set up Procedures
DEL.PRCS Delete all the Procedures
Figure 85 Report menu
Press SETUPRPT to create a new Report.
Info required are:
Report name
DUT model (Device Under Test)
DUT Serial Number (Device Under Test)
Operator
Job Number
Found Left
Up Down
N. Points