Owner manual

11178035 12/2010 GB/D/F/E
WIKA Operating Instructions Hand Spindle Pump
Hand Spindle Pump
CPP1000-M/-L
11
At higher pressures a longer waiting time before stable operating conditions are
reached is to be expected than at lower pressures.
NEVER open the shut-o valve suddenly while the system is
pressurised. The valve may be opened only if the spindle has
been fully unscrewed in an anticlockwise direction.
(Exception: chapter 3.1.4 Venting the system)
Turn the spindle pump anticlockwise as far as the end-stop to vent the system
completely and only then open the shut-o valve.
You can now change the test specimen (and/or the reference instrument).
3.3 Handling the CPP1000-M/-L with shut-o valve for test connection
When calibrating instruments with large volume a shut-o valve for the test connec-
tions is a useful accessory (see chapter 9. Accessories). This shut-o valve makes
it possible to draw pressure medium from the reservoir into the pump and into the
connected test gauges. So it is not necessary to ll pressure medium into the test
specimen or the reference instrument before connecting to the pump.
For devices under test and reference instruments with a large
volume we recommend a shut-o valve on each test connec-
tion. When a ne adjustment valve (available as standard with
CPP1000-L) is used, only one shut-o valve can be mounted for the
test connection.
(1) Star handle
(2) Shut-o valve for reservoir
(3) Shut-o valve for test connections
(4) Test specimen
(5) Reference instrument
4
5
2
1
3
GB