User manual
Wide Bank 28 DS3 - Release 2.4 July 2004 7-33
Diagnostics & Troubleshooting
Testing DS3 Interfaces
DS3 Test with M23 Framing
1. Configure the DS3 for M23 framing.
(A:Active)> ds3 framing M23
ds3 framing m23
(A:Active)> ds3
- DS3
ds3 circuitid "DS3A"
ds3 clock int
ds3 clockrevert on
ds3 equipment off
ds3 framing m23
ds3 length short
ds3 line off
ds3 loopdetect off
ds3 payload off
ds3 send off
ds3 threshold off
ds3 pm lcv thresholds
min15 0
hour 0
day 1
2. Configure the test set for M23 framing, and verify that the test set frames up.
DS3 Test with C-bit Framing
1. Configure the DS3 for C-bit Parity framing.
(A:Active)> ds3 framing cbit
ds3 framing cbit
(A:Active)> ds3
- DS3
ds3 circuitid "DS3"
ds3 clock int
ds3 clockrevert on
ds3 equipmentid "DS3 Equip."
ds3 equipment off